Product Feature
Mold parts are indispensable in myriad manufacturing sectors such as plastic molds, stamping dies, automotive, electrical, and aerospace industries. Our parts boast exceptional attributes including high wear resistance, toughness, and resilience to high temperatures, cold and heat fatigue, and corrosion. They also feature high hardness and extended service life. The fatigue fracture properties of a mold are largely influenced by its strength, toughness, hardness, and the quantity of inclusions in the material. Our mold parts are crafted from superior materials such as tungsten steel, high-speed steel, bearing steel, stainless steel, brass, metal alloys, spring steel, and carbon steel, ensuring unparalleled durability and performance.
Product Description
Product name |
plastic electronic injection mold parts |
Material |
S136,SKD61,SKH-51, HPM38, STAVAX, 1.2343, 1.2344, 1.2767, 8407, ect |
Tolerance |
Can be ±0.001mm,high accuracy |
Processing step |
material cutting→turning→milling→heat treatment→coreless grinding→wire EDM→surface treatment→polishing→inspection→packing&shipping |
Surface treatment |
Blackening, phosphating, pickling, electroless plating of various metals and alloys, TD treatment, QPQ treatment, chemical oxidation, anodizing, electrochemical polishing, electroplating, sand blasting, polishing, rolling, polishing, brushing, spraying |
Processing equipment |
CNC lathe, CNC turning milling grinding drilling machine,Wire E.D.M,PG ,Cylindrical internal grinding machine,Grinder,planer,spark Machines, |
Inspection instrument |
projector,height gauge,three dimensional measuring instrument,microscope,height gauge,thickness meters, |
International standard |
Non-standard and standard(DME,HASCO,DIN,GB) |
QC System |
Pre-inspection, intermediate inspection, post-inspection, three procedures to ensure that each product is qualified |
Quality assurance |
99.9% qualified |
Delivery time |
general 10-15 days,large qty 1-2 month, |
Shipment |
international express(DHL FedEx *** UPS EMS SF Express) |
After-Sales Service |
if product is damaged,refund or repair for customer,Until the customer is satisfied |
Sample |
Sample can be provided. |
MOQ |
≥1pcs |
Factory Information
BG company was founded by Mr. Zhang in DongGuan ChangAn in 2009. Specializing in tungsten steel parts, punch die parts, and auto spare parts, we operate as an OEM manufacturer. Our products find extensive application in a wide range of industries including motor, lithium battery, medical equipment, packaging stationery, electronic appliances, automotive, precision fixtures, and precision automation machinery. With a wealth of production experience and a stable customer base, our advanced production equipment and unwavering commitment to integrity and excellence have earned us widespread acclaim in a competitive market. BG remains dedicated to our core values of meticulous design, skilled manufacturing, superior service, and continuous improvement, striving to address urgent customer needs. Join us in achieving a mutually beneficial future.
Packing & Shipping
Q:What Will You Do After Sales?
A: We offer comprehensive after-sales service. Upon receiving our products, we will follow up for your feedback. If you have any questions related to our products, our experienced engineers are always ready to assist you.
Q:
How Do You Ship The Goods And How Long Does It Take To Arrive?
A: We ship via DHL, UPS, FedEx, or ***, with an average delivery time of 3-5 days. We also offer air and sea shipping options. Alternatively, you can provide your forwarder's details, and we will coordinate with them to arrange the shipment.
Q:
Before Shipment How To Make Sure The Mould Parts Quality?
A: You are welcome to visit our factory or authorize a third party for inspection. Alternatively, we can conduct the inspection on your behalf and share a detailed production process video for your review.
Q:
How To Proceed An Order For Mould Parts?
A:1. Inform us of your requirements or application.
2. We provide a quote based on your specifications or our expert suggestions.
3. Customer confirms samples and pays the deposit for the formal order.
4. We initiate production.
Q:
What About The Lead Time?
A: Typically, it takes 3-5 days to prepare samples and 8-10 working days for mass production, depending on your specific requirements and order quantity.
Q:
What Type Of Material Is Best For My Design/Component?
A: Material selection hinges on the application and operating environment of your design. We are more than happy to discuss various options and recommend the best material for your needs.
Q:
I Have An Idea For A New Product, But Don't Know If It Can Be Manufactured. Can You Help?
A: Yes! We are always eager to collaborate with potential customers to evaluate the technical feasibility of your idea or design. We can provide guidance on materials, tooling, and anticipated setup costs.
Q:
Do You Have Any Minimum Order Quantity (MOQ) Limit for LED Light Orders?
A: We offer an incredibly flexible MOQ policy! For sample checking, a minimum of just 1 piece is available. If you have custom styles in mind, we're happy to accommodate with as few as 1 piece. We're dedicated to helping bring your ideas to life, no matter the scale.